1. 干燥完毕后将拖盘取出分别倒入PE袋中,规定每袋需过称(25KGS/袋)。统计产品的总重量,将烘干后的产品入库暂存。(备注:在最终的收粉 translation - 1. 干燥完毕后将拖盘取出分别倒入PE袋中,规定每袋需过称(25KGS/袋)。统计产品的总重量,将烘干后的产品入库暂存。(备注:在最终的收粉 English how to say

1. 干燥完毕后将拖盘取出分别倒入PE袋中,规定每袋需过称(25KGS

1. 干燥完毕后将拖盘取出分别倒入PE袋中,规定每袋需过称(25KGS/袋)。统计产品的总重量,将烘干后的产品入库暂存。
(备注:在最终的收粉总袋数必须为2的倍数的前提下,最后的2袋要平均分成重量相等的2袋,)
2. 开始收粉时间
3. 各个袋的产品重量
4. 开始收粉时间
5. 各个袋的产品重量
6. 总件数
7. 总重量
8. 结束收粉时间
9. 总时间
10. 烘干前的重量
11. 烘干后的重量
12. %物料平衡
13. 工作结束,对该区域进行清场:清洁生产用设备、工器具;清理环境卫生;对区域内的地面、工作平台进行清洁;将本批批记录拿至下一操作区域,挂好状态标识。并由另一操作人员复核。
14. 清场开始时间:
15. 清洁环境卫生 , 地面、工作台、墙面清洁无残留物。
16. 批生产转移至下一工作区 设备、工器具悬挂状态标识
17. 清场结束时间:
18.
0/5000
From: -
To: -
Results (English) 1: [Copy]
Copied!
1. after drying is complete remove the tray separately into the PE bag, each bag are required under (25KGS/). The total weight of the product, product warehousing staging after drying.(Note: at the end of the total number of bags of powder collection premise must be a multiple of 2, 2 bags to be divided into equal to the weight of the last 2 bags,)2. commencement of powder collection3. the weight of all bags products4. start powder collection time5. the weight of all bags products6. the total number of pieces7. total weight8. end of powder collection9. total time10. before drying the weight11. the dried weight12.% material balance13. the work is over, head of the region: clean production equipment, industrial devices clean sanitation to clean floors, platforms in the region; the batch of records to the next area, hanging the stateid. And by another operator for review.14. clear start time:15. clean sanitation, floor, table, wall clean and residue-free. 16. batch transfers to the next workspace equipment, utensils hanging state identification 17. a clear end date:18.
Being translated, please wait..
Results (English) 2:[Copy]
Copied!
1. After completion of the drying tray removed were poured into PE bags, each bag of provisions need to say too (25KGS / bag). Statistics on the total weight of the product, the product after drying storage scratch.
(Note: the final total number of bags of powder collecting under the premise must be a multiple of 2, the last two bags to be equally divided into 2 equal weight bag)
2. Start time income powder
3. The product weight of each bag
4. Start powder collecting time
5. weight of each bag
6. the total number of pieces
7. total weight
8. end powder collecting time
9. total time
10 dry weight before
weight after drying 11.
12.% material balance
13. the working end, the area cleared: clean production equipment, industrial equipment; clean up environmental sanitation; on the ground, working platform area clean; this will take to the next record Pipi operating area, hung state identification. Review by another operator.
14. Clearance Start time:
15. clean sanitation, floor, table, wall clean and free of residue.
16. The batch is transferred to the next work area equipment, industrial equipment suspension state identification
17. The clearance End time:
18.
Being translated, please wait..
Results (English) 3:[Copy]
Copied!
1 after the drying is completed, remove the drag plate respectively into the PE bag, the provisions of the need to have a bag (25KGS/ bag). The total weight of statistical products, the dried product storage buffer.Note: in the final total number of bags must be a multiple of 2 under the premise of the last 2 bags to be evenly divided into equal weight of 2 bags,)2 start to collect powder time3 the weight of each bag4 start to collect powder time5 the weight of each bagThe total number of 67 total weight8 finish collecting time9 total time10 weight before drying11 after drying the weight12% material balance13. The end of the work, the region cleared: cleaner production equipment, tools and instruments; clean up environmental sanitation; within the area of the ground, a working platform for cleaning; the batch record to get to the next operation area, hanging the status identification. And review by another operator.14 clear start time:15 clean sanitation, ground, working platform, metope clean without residue.16 batches of production transfer to the next working area equipment, equipment, and the status of the suspension17 time end clearance:Eighteen
Being translated, please wait..
 
Other languages
The translation tool support: Afrikaans, Albanian, Amharic, Arabic, Armenian, Azerbaijani, Basque, Belarusian, Bengali, Bosnian, Bulgarian, Catalan, Cebuano, Chichewa, Chinese, Chinese Traditional, Corsican, Croatian, Czech, Danish, Detect language, Dutch, English, Esperanto, Estonian, Filipino, Finnish, French, Frisian, Galician, Georgian, German, Greek, Gujarati, Haitian Creole, Hausa, Hawaiian, Hebrew, Hindi, Hmong, Hungarian, Icelandic, Igbo, Indonesian, Irish, Italian, Japanese, Javanese, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Korean, Kurdish (Kurmanji), Kyrgyz, Lao, Latin, Latvian, Lithuanian, Luxembourgish, Macedonian, Malagasy, Malay, Malayalam, Maltese, Maori, Marathi, Mongolian, Myanmar (Burmese), Nepali, Norwegian, Odia (Oriya), Pashto, Persian, Polish, Portuguese, Punjabi, Romanian, Russian, Samoan, Scots Gaelic, Serbian, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenian, Somali, Spanish, Sundanese, Swahili, Swedish, Tajik, Tamil, Tatar, Telugu, Thai, Turkish, Turkmen, Ukrainian, Urdu, Uyghur, Uzbek, Vietnamese, Welsh, Xhosa, Yiddish, Yoruba, Zulu, Language translation.

Copyright ©2025 I Love Translation. All reserved.

E-mail: